ems-1

Factory Energy Management Solution

System that is designed to improve efficiency of energy consumption, improve the utilization of the system, increase reliability, predict electrical system performance, and optimize energy usage to reduce cost.

oee-2

Overall Equipment Effectiveness Solution

OEE sebagai standar pengukuran produktifitas manufaktur dengan menghitung Availability x Performance x Quality. OEE adalah satu-satunya metrik terbaik untuk mengidentifikasi kerugian, menentukan tolok ukur kemajuan, dan meningkatkan produktivitas peralatan manufaktur dengan tujuan akhir untuk menaikkan Profit.

pms-1

Production Monitor System

Now, machines are equipped with sensors that send a constant stream of data to command center and monitoring equipment. Many factories want to implement process visualization systems without making changes to their existing infrastructure.